tag -->
Timings and MOQ Timings: Minimum ordering quantities (MOQ): Acetate and combination frames: 800 to 1000 pieces per model, 200 pieces per colour.
Design and technical drawings: From 3 days to two weeks depending on the size of the collection.
Prototyping: 45 days for colored prototypes. 30 days for structure sample in black.
First production: 120 days for acetate frames, 100 days for metal and injected frames.
Reorders: 90 to 120 days depending on difficulty and raw material supply.
Injection tooling: 40 days.
These are general timings, and actual timings should be confirmed with our company.
China production:
Metal frames: 500 pieces per model, 100 pieces per colour.
Acetate: 300 pieces per model, 100 pieces per colour.
Single injection, spray colour: 600 pieces per model, 100 pieces per colour.
Double injection, injected colours: 600 pieces per model, 200 pieces per colour.
These are general MOQs, and actual MOQs should be confirmed with our company.Cambodia production:
These are general MOQs, and actual MOQs should be confirmed with our company.